Verified The status above, from the church bulletins of October 4, 11 and 18, 2026.
Preliminary General considerations for work of this kind. No system, design, contractor, flooring material or schedule has been selected.
Air conditioning
- A long nave under a high timbered roof holds a great volume of air, which settles in layers.
- Ducts, units and lines must stay out of sight of the altars, windows and woodwork.
- Glass, plaster, old wood and the organ need gradual, controlled changes in temperature and humidity.
- Equipment must run quietly during Mass.
- The study will compare concealed ductwork, discreet ductless units and low-level delivery near the pews, and assess the electrical service.
Flooring
- Existing materials will be tested before removal, as is usual in older buildings.
- The subfloor will be repaired and leveled before the new surface is laid.
- The work will be phased around the Mass schedule.