Restoration & Expansion · St. Vincent de Paul Church and Academy
Stone by stone, handed on.
Since the capital campaign began in 2014, the families and priests of St. Vincent de Paul have restored the roof, the stone, the interior and the stained glass of their church, renewed the Academy and opened a second campus.

Then & now
The same stones, made whole.
Drag the line, or focus it and use the arrow keys, to compare before and after. Each pair was aligned by geometric correction only; nothing was added or removed.





The church restoration
Four works, paid in full.
Final costs of the church restoration, as listed in St. Vincent’s campaign priorities.
$1,000,000
Raised by generous faithful in the capital campaign begun in 2014, under the patronage of St. Vincent de Paul.

Phase I
Restore roof
Completed
Final cost $131,224

Phase I
Tuckpoint church
Completed
Final cost $174,200

Phase I
Parking Lot
Completed
Final cost $171,821

Phase II
Church Interior: re-plaster and paint
Completed
Final cost $479,679
Sum of listed costs $956,924
The projects
Five works of one church.
Church Restoration
Honoring our Past, Securing our Future
Phase I of the Capital Campaign restored the roof, tuck-pointed the exterior stonework and added a new parking lot.
- 2015
- The most urgent slate tiles on the roof repaired, the stone tuck-pointed and the downspouts repaired.
- Roof
- Roof slates were replaced, gutters patched and gutter straps replaced.
- Masonry
- Completed masonry work included cleaning, tuckpointing, stone replacement, caulking and patching.
- Parking lot
- The parking lot was completed in July 2019 and sealed in 2021.
- Phase II
- Church Interior: re-plaster and paint – completed in October 2019.
Those who led the work
Facility Improvement Planning Team
- Fr. Burfitt
- Fr. Muscha
- Dave Wohletz
Our Capital Campaign Teams
- Communications Team
- Events Team
- Thanks Team
- Youth Team


Stained Glass
2022–24 · 2025–26
In two phases, half of the church’s stained glass windows at a time, the windows are cleaned, resealed and protected: Phase 1 in 2022–2024 and Phase 2, the remaining half, in 2025–2026. The work follows a program of historic restoration: the windows are removed, restored and reinstalled, with a protective covering installed in the traceries.
It was a massive effort. Because of its cost and the time it required, the work was divided into two phases.


Academy Restoration
Summer 2017
The Summer 2017 restoration of St. Vincent de Paul Academy.
Exterior Improvements
The eaves of the south side and the northeast corner, with the windows and stonework.
Interior Improvements
From the Summer 2017 update:
Improvements are being made on the interior of the Academy building as well this summer.
- Sanding and refinishing of some of the classroom floors.
- Painting classrooms, halls, and stairwells
- Staining woodwork
- Fixing cafeteria floor tiles
- Fixing tiles in the school entry
- Replacing fluorescent lights with LED lights
1989 The Academy building is obtained and restored, and classes begin in 1991.



Expansion
2018 · Opened 2020/2021
St. Vincent de Paul Church and Academy Expansion.
- 2018
- St. Vincent’s purchases a new school building on Tracy Avenue.
- September 2, 2018
- Options for Expansion, with questions and answers regarding the presentation.
- 2020
- St. Vincent de Paul Academy begins its 2020–2021 school year on two campuses, the new Tracy Avenue Campus and the Flora Campus.




Parish Hall
2026 · In progress
Parish Hall renovation: funded in two phases; work began in spring 2026 and is nearly complete, with final woodwork and painting under way.
At the 2026 Academy Auction, guests gave $52,000 through Fund A Need toward Phase 2 of the parish hall renovation, which aims to make the space better suited to both church and school events.
“The campaign is more than just fundraising. It aims at nothing less than to ‘Restore All Things in Christ.’”
Fr. Michael Goldade, then our prior, now His Excellency Bishop Goldade, in his letter for the capital campaign
A chronology
Twelve years of patient work.
1989
An earlier generation
The Academy building is obtained and restored, and classes begin in 1991.
2014
Capital campaign launched
Fundraising
St. Vincent’s begins a capital campaign to restore its nearly 95-year-old church. Under the patronage of St. Vincent de Paul, generous faithful raise $1,000,000.
The campaign brochure and Fr. Goldade’s letter, kept in the archive below, were prepared for the 2015 campaign.

2015
Urgent repairs to the church
Roof, stone & downspouts
The most urgent slate tiles on the roof are repaired, the stone is tuck-pointed and the downspouts are repaired.
2017
Academy restoration
Construction · Summer
The eaves and stonework outside; inside, refinished classroom floors, painting, stained woodwork, repaired cafeteria and entry tiles, and LED lighting.

2018
The Tracy Avenue building
Planning
St. Vincent’s purchases a new school building on Tracy Avenue. Options for Expansion follow on September 2, 2018.
2019
Phase I complete
Completion
St. Vincent’s completes Phase I of its Capital Campaign, which included restoring the roof, tuck-pointing the exterior stonework and adding a new parking lot. The parking lot was completed in July 2019 and sealed in 2021.

2019
The church interior
Phase II · October
Completion of Phase II of the Capital Campaign: the re-plastering and painting of the entire church interior.

2020–21
Two campuses
Opening
St. Vincent de Paul Academy begins its 2020–2021 school year on two campuses, the new Tracy Avenue Campus and the Flora Campus.

2022–24
The stained glass windows
Phase 1
Half of the church’s stained glass windows are cleaned, resealed and protected. The windows are removed, given a program of historic restoration and reinstalled, with a protective covering installed in the traceries.

2024
The consecration
September 26
His Excellency Bishop Bernard Fellay consecrates St. Vincent de Paul Church, along with three of her altars, in honor of St. Vincent de Paul, the Blessed Virgin Mary and St. Joseph, as part of the church’s centenary. By this ceremony St. Vincent’s is set apart permanently and exclusively for the Sacred Liturgy.

2025–26
The stained glass windows
Phase 2
The remaining half of the windows are cleaned, resealed and protected; the work is completed in 2026.
2026
Parish Hall renovation
In progress
Funded in two phases; work began in spring 2026 and is nearly complete, with final woodwork and painting under way.
The archive
Kept as it was written.
The campaign’s original documents, letters and photographs, word for word.
The 2015 campaign brochureEight photographs · Landscape Blueprint · Google Earth Snapshot
From the 2015 capital campaign brochure.








Fr. Michael Goldade’s letterTo the parishioners, for the 2015 capital campaign
Dear Parishioners,
I wish to begin by expressing gratitude to God for the many gifts which He has given to this parish: a large Gothic church, a proper rectory, a beautiful school. These are only the material gifts. What about the people who acquired them, who maintained them and who now fill them? It is obvious that along the way there was always the right person for the right job.
Those who built up the parish certainly appreciated these gifts, but an approaching third generation will inherit them, and they must understand their value and sacrifice to maintain them. Those, older in years, who did their part, eagerly wait for younger people to follow in their footsteps.
It has been observed in family businesses that the zeal and hard work which inspired the first two generations did not always carry over to the third, and therefore the business folded. We want to prevent such complacency, and this will be one of the great fruits of the capital campaign.
The campaign is more than just fundraising. It aims at nothing less than to “Restore All Things in Christ.” It is a reminder of who we are and what we must do. I see the campaign as a cultural boost, making the Church the focus in the lives of your families, and the more we sacrifice for it, the more we value it.
It is not enough that we hand on the gift of the Church to our children, we want them to be taught the lesson of the centrality of the Church in their spiritual and social lives. In a Catholic age the Church was at the center of the city and the center of life where one was baptized, confirmed, married, and buried. It was even the place where Catholic monarchs, the heads of government, were crowned. For us it is all of that and more.
I must thank the volunteers of the various teams who enthusiastically supported this effort with their time, ideas, and action. Our consultant, Joe Akers, has been invaluable. Organizing such an operation is like preparing a new food dish – you have to have a bit of faith in the recipe and directions.
Please enjoy this brochure, which recalls our history and our hope for St. Vincent de Paul Church. I encourage you to pray this novena to our patron. Such a big step forward must be the fruit of prayer. One thinks of the teacher Gamaliel when speaking of the early Church: “If this work be of men, it will come to nought: but if it be of God, you cannot overthrow it.” God bless you.
In the hearts of Jesus and Mary,
Fr. Michael Goldade
Reasons to Act (2015)Why the parish began the campaign
- St. Vincent de Paul is fiscally sound, projecting an operating budget surplus for 2015
- The current budget, while strong, does not have room to absorb major restoration issues.
- Parishioners are generally enthused about the campaign and the restoration projects.
- One hundred percent (100%) of campaign contributions will remain at St. Vincent’s and be used solely for restoration projects. There will be no District assessment on campaign contributions.
- Delaying restoration may result in major damage and unmanageable capital maintenance expense.
The restoration updates, as first publishedWith the original before and after photographs
Restoration Update




Completed masonry work included cleaning, tuckpointing, stone replacement, caulking and patching.
Roof slates were replaced, gutters patched and gutter straps replaced.
Parking Lot Update
The parking lot was completed in July 2019.
Church Interior Update
The re-plastering and painting of the interior of the church was completed in October 2019.


Our Priorities
Phase I
- Restore roof – completed. Final cost – $131,224
- Tuckpoint church – completed. Final cost – $174,200
- Parking Lot – completed. Final cost – $171,821
Phase II
- Church Interior: re-plaster and paint – completed. Final cost – $479,679
All documentsSeven PDFs, each opens in a new tab
- Landscape BlueprintPDF (PDF, opens in a new tab)
- Google Earth SnapshotPDF (PDF, opens in a new tab)
- Expansion TimelinePDF (PDF, opens in a new tab)
- Option APDF (PDF, opens in a new tab)
- Option BPDF (PDF, opens in a new tab)
- Option CPDF (PDF, opens in a new tab)
- Questions and answers from the presentationPDF (PDF, opens in a new tab)
“Thank you very much for all your prayers and sacrifices. May God reward you eternally.”
They restored it. Ours is to keep it.
Previous generations restored this church. Our generation now preserves it, beginning with air conditioning and a worthy new floor for St. Vincent de Paul Church.
The Air Conditioning & Flooring Campaign All ways to giveOur History
A redesigned campaign page is in preparation.