Since the capital campaign began in 2014, the families and priests of St. Vincent de Paul have restored the roof, the stone, the interior and the stained glass of their church, renewed the Academy and opened a second campus.

St. Vincent de Paul Church and the Academy beside it, seen from the air: the stone tower and gable, slate roofs and the lawns along the street
The church and the Flora Campus of the Academy

Then & now

The same stones, made whole.

Drag the line, or focus it and use the arrow keys, to compare before and after. Each pair was aligned by geometric correction only; nothing was added or removed.

After: The same wall after the restoration, the stones cleaned and repointed and the belt course clean
Before: A limestone wall of the church before the restoration: stained, weathered stones, open mortar joints and a rust-streaked stone belt course
Masonry: cleaning, tuckpointing, stone replacement, caulking and patching
After: The same slate roof after the work, the slates clean, green with scattered red ones
Before: The church’s slate roof before the work, a dark streak of moss and algae running down the slates, with the metal valley flashing at left
The slate roof · Phase I
After: The same church front after the restoration, the stone cleaned and lighter
Before: The stone front of St. Vincent de Paul Church before the restoration, its tower and great window darkened with grime
The church front
After: The same transept window after re-plastering and painting, in a smooth, pale wall
Before: A tall stained glass transept window in a worn, uneven plaster wall before the interior restoration
The transept window wall, before and after the interior re-plastering and painting
After: The same aerial view after the work: the new striped asphalt parking lot beside the church and Academy
Before: Aerial view of the lot beside the church before paving: graded dirt with excavators at work
The parking lot · completed July 2019

The church restoration

Four works, paid in full.

Final costs of the church restoration, as listed in St. Vincent’s campaign priorities.

$1,000,000

Raised by generous faithful in the capital campaign begun in 2014, under the patronage of St. Vincent de Paul.

  1. The restored slate roof of the church: green slates with scattered red ones, and the metal valley flashing at left

    Phase I

    Restore roof

    Completed

    Final cost $131,224

  2. Restored limestone masonry of the church: rough-faced stones in fresh mortar above and below a smooth stone belt course

    Phase I

    Tuckpoint church

    Completed

    Final cost $174,200

  3. The new striped asphalt parking lot beside the church, seen from the air

    Phase I

    Parking Lot

    Completed

    Final cost $171,821

  4. Phase II - Church Interior

    Phase II

    Church Interior: re-plaster and paint

    Completed

    Final cost $479,679

Sum of listed costs $956,924

The projects

Five works of one church.

Church Restoration

Honoring our Past, Securing our Future

Phase I of the Capital Campaign restored the roof, tuck-pointed the exterior stonework and added a new parking lot.

2015
The most urgent slate tiles on the roof repaired, the stone tuck-pointed and the downspouts repaired.
Roof
Roof slates were replaced, gutters patched and gutter straps replaced.
Masonry
Completed masonry work included cleaning, tuckpointing, stone replacement, caulking and patching.
Parking lot
The parking lot was completed in July 2019 and sealed in 2021.
Phase II
Church Interior: re-plaster and paint – completed in October 2019.

Those who led the work

Facility Improvement Planning Team

  • Fr. Burfitt
  • Fr. Muscha
  • Dave Wohletz

Our Capital Campaign Teams

  • Communications Team
  • Events Team
  • Thanks Team
  • Youth Team
Close view of the church's slate roof
The slate roof
Binter, Wohletz, McMaster - the SVDP work crew, standing together with coffee cups in a parish hall
Binter, Wohletz, McMaster - the SVDP work crew have cared for the church for decades.

See the before and after photographs 

Stained Glass

2022–24 · 2025–26

In two phases, half of the church’s stained glass windows at a time, the windows are cleaned, resealed and protected: Phase 1 in 2022–2024 and Phase 2, the remaining half, in 2025–2026. The work follows a program of historic restoration: the windows are removed, restored and reinstalled, with a protective covering installed in the traceries.

It was a massive effort. Because of its cost and the time it required, the work was divided into two phases.

The consecration of the church, September 26, 2024 

Metal scaffolding rising inside the church toward the clerestory windows, with no people present
Scaffolding inside St. Vincent’s during the stained glass window restoration.
Seen from the choir loft, the packed nave of St. Vincent de Paul beneath dark timber arches and tall stained-glass windows, with the carved high altar far ahead
The windows of the nave, October 18, 2026

Academy Restoration

Summer 2017

The Summer 2017 restoration of St. Vincent de Paul Academy.

Exterior Improvements

The eaves of the south side and the northeast corner, with the windows and stonework.

Interior Improvements

From the Summer 2017 update:

Improvements are being made on the interior of the Academy building as well this summer.

  • Sanding and refinishing of some of the classroom floors.
  • Painting classrooms, halls, and stairwells
  • Staining woodwork
  • Fixing cafeteria floor tiles
  • Fixing tiles in the school entry
  • Replacing fluorescent lights with LED lights

1989 The Academy building is obtained and restored, and classes begin in 1991.

Eaves South Side
Eaves South Side
Eaves at the northeast corner of the Academy, before restoration
The Academy eaves before the Summer 2017 restoration.
Academy window and stonework, before restoration
Academy window and stonework before the restoration.

Expansion

2018 · Opened 2020/2021

St. Vincent de Paul Church and Academy Expansion.

2018
St. Vincent’s purchases a new school building on Tracy Avenue.
September 2, 2018
Options for Expansion, with questions and answers regarding the presentation.
2020
St. Vincent de Paul Academy begins its 2020–2021 school year on two campuses, the new Tracy Avenue Campus and the Flora Campus.
Tracy Campus building
Tracy Campus · Opened 2020/2021
Architectural rendering by Archimages
Architectural rendering by Archimages · Options for Expansion, September 2, 2018
Tracy Campus building
Red brick building and workshop

Parish Hall

2026 · In progress

Parish Hall renovation: funded in two phases; work began in spring 2026 and is nearly complete, with final woodwork and painting under way.

At the 2026 Academy Auction, guests gave $52,000 through Fund A Need toward Phase 2 of the parish hall renovation, which aims to make the space better suited to both church and school events.

The Academy Auction 

“The campaign is more than just fundraising. It aims at nothing less than to ‘Restore All Things in Christ.’”

Fr. Michael Goldade, then our prior, now His Excellency Bishop Goldade, in his letter for the capital campaign

A chronology

Twelve years of patient work.

  1. 1989

    An earlier generation

    The Academy building is obtained and restored, and classes begin in 1991.

  2. 2014

    Capital campaign launched

    Fundraising

    St. Vincent’s begins a capital campaign to restore its nearly 95-year-old church. Under the patronage of St. Vincent de Paul, generous faithful raise $1,000,000.

    The campaign brochure and Fr. Goldade’s letter, kept in the archive below, were prepared for the 2015 campaign.

    Church restoration photo: stonework
  3. 2015

    Urgent repairs to the church

    Roof, stone & downspouts

    The most urgent slate tiles on the roof are repaired, the stone is tuck-pointed and the downspouts are repaired.

  4. 2017

    Academy restoration

    Construction · Summer

    The eaves and stonework outside; inside, refinished classroom floors, painting, stained woodwork, repaired cafeteria and entry tiles, and LED lighting.

    Eaves South Side
  5. 2018

    The Tracy Avenue building

    Planning

    St. Vincent’s purchases a new school building on Tracy Avenue. Options for Expansion follow on September 2, 2018.

  6. 2019

    Phase I complete

    Completion

    St. Vincent’s completes Phase I of its Capital Campaign, which included restoring the roof, tuck-pointing the exterior stonework and adding a new parking lot. The parking lot was completed in July 2019 and sealed in 2021.

    The new parking lot beside the church, freshly paved and striped
  7. 2019

    The church interior

    Phase II · October

    Completion of Phase II of the Capital Campaign: the re-plastering and painting of the entire church interior.

    Phase II - Church Interior
  8. 2020–21

    Two campuses

    Opening

    St. Vincent de Paul Academy begins its 2020–2021 school year on two campuses, the new Tracy Avenue Campus and the Flora Campus.

    The Tracy Avenue Campus, a tan two-story school building on a grassy rise, with steps up from the drive, under a clear blue summer sky
  9. 2022–24

    The stained glass windows

    Phase 1

    Half of the church’s stained glass windows are cleaned, resealed and protected. The windows are removed, given a program of historic restoration and reinstalled, with a protective covering installed in the traceries.

    Metal scaffolding rising inside the church toward the clerestory windows, with no people present
  10. 2024

    The consecration

    September 26

    His Excellency Bishop Bernard Fellay consecrates St. Vincent de Paul Church, along with three of her altars, in honor of St. Vincent de Paul, the Blessed Virgin Mary and St. Joseph, as part of the church’s centenary. By this ceremony St. Vincent’s is set apart permanently and exclusively for the Sacred Liturgy.

    The marble altar of St. Vincent de Paul burning with five fires of incense during its consecration, with the bishop in gold vestments and clergy kneeling before it
  11. 2025–26

    The stained glass windows

    Phase 2

    The remaining half of the windows are cleaned, resealed and protected; the work is completed in 2026.

  12. 2026

    Parish Hall renovation

    In progress

    Funded in two phases; work began in spring 2026 and is nearly complete, with final woodwork and painting under way.

The archive

Kept as it was written.

The campaign’s original documents, letters and photographs, word for word.

The 2015 campaign brochureEight photographs · Landscape Blueprint · Google Earth Snapshot
Fr. Michael Goldade’s letterTo the parishioners, for the 2015 capital campaign

Dear Parishioners,

I wish to begin by expressing gratitude to God for the many gifts which He has given to this parish: a large Gothic church, a proper rectory, a beautiful school. These are only the material gifts. What about the people who acquired them, who maintained them and who now fill them? It is obvious that along the way there was always the right person for the right job.

Those who built up the parish certainly appreciated these gifts, but an approaching third generation will inherit them, and they must understand their value and sacrifice to maintain them. Those, older in years, who did their part, eagerly wait for younger people to follow in their footsteps.

It has been observed in family businesses that the zeal and hard work which inspired the first two generations did not always carry over to the third, and therefore the business folded. We want to prevent such complacency, and this will be one of the great fruits of the capital campaign.

The campaign is more than just fundraising. It aims at nothing less than to “Restore All Things in Christ.” It is a reminder of who we are and what we must do. I see the campaign as a cultural boost, making the Church the focus in the lives of your families, and the more we sacrifice for it, the more we value it.

It is not enough that we hand on the gift of the Church to our children, we want them to be taught the lesson of the centrality of the Church in their spiritual and social lives. In a Catholic age the Church was at the center of the city and the center of life where one was baptized, confirmed, married, and buried. It was even the place where Catholic monarchs, the heads of government, were crowned. For us it is all of that and more.

I must thank the volunteers of the various teams who enthusiastically supported this effort with their time, ideas, and action. Our consultant, Joe Akers, has been invaluable. Organizing such an operation is like preparing a new food dish – you have to have a bit of faith in the recipe and directions.

Please enjoy this brochure, which recalls our history and our hope for St. Vincent de Paul Church. I encourage you to pray this novena to our patron. Such a big step forward must be the fruit of prayer. One thinks of the teacher Gamaliel when speaking of the early Church: “If this work be of men, it will come to nought: but if it be of God, you cannot overthrow it.” God bless you.

In the hearts of Jesus and Mary,
Fr. Michael Goldade

Reasons to Act (2015)Why the parish began the campaign
  • St. Vincent de Paul is fiscally sound, projecting an operating budget surplus for 2015
  • The current budget, while strong, does not have room to absorb major restoration issues.
  • Parishioners are generally enthused about the campaign and the restoration projects.
  • One hundred percent (100%) of campaign contributions will remain at St. Vincent’s and be used solely for restoration projects. There will be no District assessment on campaign contributions.
  • Delaying restoration may result in major damage and unmanageable capital maintenance expense.
The restoration updates, as first publishedWith the original before and after photographs

Restoration Update

Church front, before
Before
Church front, after
After
Masonry, before
Before
Masonry, after
After

Completed masonry work included cleaning, tuckpointing, stone replacement, caulking and patching.

Roof slates were replaced, gutters patched and gutter straps replaced.

Parking Lot Update

The parking lot was completed in July 2019.

Church Interior Update

The re-plastering and painting of the interior of the church was completed in October 2019.

Transept Window, before
Before
Transept Window, after
After

Our Priorities

Phase I

  • Restore roof – completed. Final cost – $131,224
  • Tuckpoint church – completed. Final cost – $174,200
  • Parking Lot – completed. Final cost – $171,821

Phase II

  • Church Interior: re-plaster and paint – completed. Final cost – $479,679
All documentsSeven PDFs, each opens in a new tab

“Thank you very much for all your prayers and sacrifices. May God reward you eternally.”

Archbishop Marcel Lefebvre, to the Fathers and Faithful of St. Vincent de Paul, October 4, 1989

They restored it. Ours is to keep it.

Previous generations restored this church. Our generation now preserves it, beginning with air conditioning and a worthy new floor for St. Vincent de Paul Church.

The Air Conditioning & Flooring Campaign All ways to giveOur History

A redesigned campaign page is in preparation.

Report a website problem

Something broken, missing or hard to read? Let us know about any problem with the website.